Leavenworth, Kansas - Army Reserve Center
|
ANTICIPATING CHALLENGES BEFORE THEY OCCUR sys-tek performed the pre-functional testing of the equipment listed in the table and documented the results. Functional testing was accomplished by the procedures as described within each test. In general, each function of the control system was tested to determine that correct or anticipated reaction was achieved. |
SPIRIT Commissioning Projectsys-tek provided commissioning and testing, adjusting and balancing services for the mechanical equipment and building automation control systems for this 40,000 square foot Army Reserve Center. The systems balanced and commissioned included chillers, boilers with associated pumping and distribution systems, air-handling units, traditional variable volume systems, terminal units including VAV boxes, fan coil units, unit heaters, exhaust fans and temperature control systems. ENSURING OWNER’S DESIGN NEEDS WERE FULLY METAs the commissioning agent, sys-tek, developed and documented the functional testing procedures for the controls and equipment. sys-tek executed the functional test for the airhandling systems, the heating hot water and chilled water systems with the assistance of installing contractors when required. The installing contractor, at the recommendation and approval of the CX Agent and Owner representative, implemented corrections to the equipment and/or control sequence programming. Implemented corrections were verified by retesting of the specific sequence. In the design phase, we documented the design intent and continued through construction, acceptance and supported these efforts during the warranty period. Commissioning services during the construction of this project included the following specific objectives:
|