ABN AMRO - Critical Facility Commissioning
|
CHICAGO, ILLINOIS
"Attention to Detail, Test Method and Development of Procedures were Simply Outstanding" --John Learch, Chief Engineer |
CRITICAL FACILITY COMMISSIONING The project included commissioning a new data center for a 30-story building located in Chicago, where floors 3, 4 and 5 were used for the data center. The project included 80,000 square feet of raised floor for the data center. The mechanical and electrical infrastructure included the following:
LIMITED SCHEDULE We arrived on this site in April where the data center was scheduled to go live by September 1st. When we arrived, this 30-story building was still well under construction, with unopenable elevators. Our scope of work was to provide a comprehensive engineering evaluation and report. From this review, we developed a comprehensive commissioning plan to bring the data center on-line and on schedule. To ensure that we could meet the project objectives, we provided daily observation and inspections of the systems as they were being installed to minimize the commissioning time-line that is normally required once systems are installed. We chaired weekly commissioning meetings with all the contractors outlining requirements and necessary tasks needed to meet the on-line date. Working side-by-side with the installing contractors, design engineers, and facility managers, we were able to effectively eliminate potential operational problems during the installation. EXCEEDING CLIENT EXPECTATIONS Eighteen months after the project completion we provided Level 5 annual commissioning for this project which included load testing generators and UPS modules. Scope of work included performing battery discharge testing for UPS batteries and integration testing of alarms and redundant systems. Services provided for annual commissioning included:
|